Marlen Gutierrez
512.577.6119
Marlen.rum@gmail.com
SUMMARY
Civil Engineering/Pipeline Designer with over 15 years of experience, including oil & gas pipeline layout, land
development, site layout, infrastructure, landscape, utilities design, plan and profiles, traffic control plans,
development/implementation of CAD standards, and QA/QC.
Surveying Technician experienced in oil & gas, transmission lines, right -of-way acquisition plats, mapping utilizing
AutoCAD and Civil 3D, QA/QC, data management, property research, project tracking & internal team coordination.
SKILLS
Software
· Experience with AutoCAD Civil 3D (2011-2015), AutoCAD (R12 thru 2015), Land Desktop, Bentley MicroStation,
ArcGIS, Microsoft Office, Word, Excel, Outlook, Powerpoint, Google Earth. Familiar with Cadworx and Revit
Industry Specific
· Experienced with piping layouts, xref’s, details, sections, elevations, ISO’s, and material take-offs.
Languages
· Proficient in: English and Spanish
EDUCATION
Austin Community College
Austin, TX
· Autodesk Certification: AutoCAD 3D modeling
Texas State University
San Marcos, TX
· BAAS, Major: Interdisciplinary, with concentration in Geography and Land Use Planning
Magna Cum Laude / Dean’s List
Austin Community College
Austin, TX
1997-1999
· AAS, Engineering Design Graphics: Interdisciplinary (Mechanical, Architectural, Civil, Electrical , & CAD
customization)
Magna Cum Laude / President’s Honors Roll
EXPERIENCE
Pipeline Designer
2003-2007
2009
05/ 2014 - Present
Campos EPC
· Develop, design and draft CAD files based on mechanical and piping drawings for oil and gas piping projects.
· Assist Engineers in the development of construction documents.
· Prepare Line Lists, Manual Valve Lists, Drawings Lists and Bills of Materials.
· Recommend modifications and changes for design improvement and simplification.
· Produce technical drawings and piping isometrics from conceptual layout to detailed finished product.
· Maintain design production standards
Marlen Gutierrez
512.577.6119
Marlen.rum@gmail.com
EXPERIENCE
Civil Designer/ Survey Technician
Freelance
03/ 2002 – 04/2014
· As a contractor, work hard on keeping client’s needs at the forefront; consistently aspiring to exceed
expectations and delivering in a timely manner to meet deadlines.
· Recent project: Rancho Sienna LPG tank sites and main/service gas lines layout in multi -section residential
subdivision.
Survey Technician
09/ 2010 – 03/ 2013
Surveying And Mapping, Inc. (SAM, Inc.)
· Created survey plats and legal descriptions for electric transmission, and oil & gas pipeline easements.
·
Implemented quality control checks on plats and field notes prepared by other technicians.
· Performed deed research, deed plotting and map checks.
· Assisted in the creation of boundary mosaics.
· Coordinated workload and reviewed drawings within a team of 10+ technicians.
Senior Civil Designer
Kellogg, Brown and Root (KBR, Inc.)
· Primarily involved in the Waller Creek Flood Control Tunnel project (a mile-long stormwater bypass tunnel)
design using Autocad 3D modeling and Civil 3D; also responsible for the review and enforcement of the
project’s CAD standards on multiple subcontractors across different disciplines .
·
Intermittently, provided support on the City of San Marcos and City of Austin Rotation List projects.
· Provided GIS support to Environmental Scientists, digitizing shapes, modifying features, splitting and merging,
editing feature attribute values, and creating exhibits.
Lead Civil Designer
McEntee Engineering & Design, Inc.
· Worked as lead designer specializing in commercial land development. Was exposed to all aspects of civil
design, including site layout, grading, drainage and utility design.
· Provided technical guidance to lower-level Designers in completing complex assignments.
· Reviewed project documents prior to issue, for scope and presentation against project standards and
specifications.
Senior Cad Tech
CAS Consulting & Services, Inc.
· As the sole drafter for this company, at that time, was responsible for the production of CAD drawings for all
projects, with great emphasis on maintaining a high degree of quality and consistency. Sample Projects: ACWP,
Seaholm power plant remediation, CMTA – traffic control plans, COA ABIA East roadway design.
· Created a file management system and established CAD standards .
10/ 2005 – 06/ 2006
01/ 2007 – 10/ 2007
02/ 2009 – 05/ 2010
Marlen Gutierrez
512.577.6119
Marlen.rum@gmail.com
EXPERIENCE
Land Acquisition Intern
Austin Habitat for Humanity
· Produced an inventory book and database of all vacant lots within a target area for potential infill development
of affordable homes. Book included: land use & tax maps, tax appraisal and owner contact information.
· Carried out extensive research for potential lots and properties available at the tax foreclosure auction.
Evaluated properties based on site inspections and analysis of TCAD appraisal rolls, deed records and FEMA
floodplain information
· Created neighborhood study based on demographics and crime statistics .
Survey Tech
Macias & Associates, L.P.
· A member of the LSI right -of-way team for the State Highway 130 (SH 130) project. Utilized tax maps and TCAD
to research deed ownership, boundary and easements to create survey plats and legal descriptions for parcel
acquisitions.
· QA/QC - Responsible for reviewing and revising production drawings, time-sensitive quality control that required
extreme attention to detail.
· Reviewed title commitments and survey data such as closures, ownership information and encumbrances, as
well as aesthetic standards.
CAD Technician
Loomis Austin, Inc.
10/ 2003 – 06/ 2005
· Worked closely with H&H engineer in the design of sedimentation, detention/wet ponds and dams. Tasks
included drainage studies, cut and fill calculations, and profiles of cross sections; site designs, exhibits, reports
and other construction plans for the Cingular cellular towers.
CAD Drafter III
Bury + Partners
07/ 1999 – 03/ 2001
· Progressive experience in increasingly complex land development projects including: multi -family, residential
subdivisions, commercial, retail and office projects.
10/ 2003 – 06/ 2005
07/ 2005 – 08/ 2006